Connected
Activity

Audit log

Who approved, overrode, stopped and signed, with before and after. Read only; entries cannot be edited or removed.
Export audit extract

Events

Audit events
TimePersonActionObjectBefore → afterLineSource
20 Oct 14:00Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app
20 Oct 10:53Shift lead A.Shift leadDeclined proposalMelt temperature 236 to 232 °CNo value changeLine Bin-app
20 Oct 07:46Plant head A.Plant headSigned trial orderHold temperature trial, Line ANo value changeLine Ain-app
20 Oct 04:39Operator C.OperatorPressed StopHold temperature trial, Line ANo value changeLine Ain-app
20 Oct 01:32Quality head A.Quality headConfirmed lot linkLot 3296No value changeLine Ain-app
19 Oct 22:25Quality head A.Quality headSent correctionRaise agitator speed for lot 3307No value changeLine Ain-app
19 Oct 19:18Process engineer A.Process engineerNarrowed limitHold temperature window, Line A78 to 92 °C80 to 90 °CLine Ain-app
19 Oct 16:11Plant head A.Plant headGranted standing approvalCycle time approval, Line BNo value changeLine Bin-app
19 Oct 13:04Owner A.OwnerExported reportMonthly value, September 2026No value changePlantin-app
19 Oct 09:57Shift lead A.Shift leadRevoked leaseLease issued 11/10 14:00No value changePlantin-app
19 Oct 06:50Operator A.OperatorSetpoint writtenBatch 2417No value changeLine Asystem
19 Oct 03:43Process engineer A.Process engineerDrafted trialTool temperature trial, Line BNo value changeLine Bin-app
19 Oct 00:36Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app
18 Oct 21:29Shift lead A.Shift leadDeclined proposalMelt temperature 236 to 232 °CNo value changeLine Bin-app
18 Oct 18:22Plant head A.Plant headSigned trial orderHold temperature trial, Line ANo value changeLine Ain-app
18 Oct 15:15Operator C.OperatorPressed StopHold temperature trial, Line ANo value changeLine Ain-app
18 Oct 12:08Quality head A.Quality headConfirmed lot linkLot 3296No value changeLine Ain-app
18 Oct 09:01Quality head A.Quality headSent correctionRaise agitator speed for lot 3307No value changeLine Ain-app
18 Oct 05:54Process engineer A.Process engineerNarrowed limitHold temperature window, Line A78 to 92 °C80 to 90 °CLine Ain-app
18 Oct 02:47Plant head A.Plant headGranted standing approvalCycle time approval, Line BNo value changeLine Bin-app
17 Oct 23:40Owner A.OwnerExported reportMonthly value, September 2026No value changePlantin-app
17 Oct 20:33Shift lead A.Shift leadRevoked leaseLease issued 11/10 14:00No value changePlantin-app
17 Oct 17:26Operator A.OperatorSetpoint writtenBatch 2417No value changeLine Asystem
17 Oct 14:19Process engineer A.Process engineerDrafted trialTool temperature trial, Line BNo value changeLine Bin-app
17 Oct 11:12Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app
Showing 25 of 60Show 25 more

Pressed Stop

Illustrative
When
18 Oct 15:15 IST · 47 h ago
Person
Operator C., Operator
Object
trial Hold temperature trial, Line A
Line
Line A · Batch mixing
Source
Decided in Stamped

Before and after

This event did not change a value. It records a decision about Hold temperature trial, Line A.

Evidence on the object

Trial
Hold temperature 84 to 86 °C on Grade A-12
Stop
Restored 84 °C for batch 2409; trial resumed next batch after review; restored

Other events on this object

By person

By person
PersonEventsLast
Shift lead A.10Declined proposal3 h ago
Plant head A.10Signed trial order6 h ago
Quality head A.10Confirmed lot link12 h ago
Process engineer A.10Narrowed limit19 h ago
Operator B.5Accepted proposalin 0 min
Operator C.5Pressed Stop9 h ago
Owner A.5Exported report25 h ago
Operator A.5Setpoint written31 h ago