Connected
Lot detail and join · Line A · Batch mixing
Lot 3296 · Grade A-14
Join
estimated
Lot
3296
Charge · Mix · Hold · Discharge · Lab
Batch 2413Lot 3296 to batch 2413
estimatedLink0.86suggested
Driven by time proximity, recipe match, sequence consistency, scanned identifier.
Why this confidence
- Method
- Weights fitted on a verification sample; penalty when several candidates fit
Time0.71Recipe1Sequence0.94Scanned id1Penalty0
Batch 2412Lot 3296 to batch 2412
estimatedLink0.93suggested
Driven by time proximity, recipe match, sequence consistency, scanned identifier.
Why this confidence
- Method
- Weights fitted on a verification sample; penalty when several candidates fit
Time0.7Recipe1Sequence0.92Scanned id1Penalty0
Viscosity against spec
EstimatedViscosity2585 mPa·s90% interval 2540 to 2630
Spec 2600 to 2840 mPa·s (dashed). Driven by Linked run outcomes, No lab result yet.
Why this confidence
- Method
- Unanchored, cannot support a decision
- Model fit
- Accepted, four checks passed
Unanchored, cannot support a decisionWaiting for the lab system
Grade A-14, last 1 lots
Runs in this lot
| Run | Ended | Viscosity | Energy per batch | Link |
|---|---|---|---|---|
| Batch 2413 | 18 Oct 06:00 | 2487.5 mPa·s Estimated | 416.2 kWh Measured | 0.86 suggested |
| Batch 2412 | 17 Oct 21:00 | 2421.8 mPa·s Estimated | 423.9 kWh Measured | 0.93 suggested |
Other Grade A-14 lots
Nothing here yet
Same grade: no rows in this view.
Facts
- Grade
- Grade A-14
- Spec
- Viscosity 2600 to 2840 mPa·s, target 2720
- Source
- SPEC-A14 rev 1
- Stages
- Charge, Mix, Hold, Discharge, Lab
- Status
- in process
- Release
- In the plant's quality system only
Evidence on demand
Lot 3307 viscosity save
No changeR2Unknown
Effect Viscosity vs predicted +12 mPa·s, interval -30 to 54 mPa·s.
Why this confidence
- Method
- Before and after on matched lots
- Diagnostics
- Unanchored until lab result
Corrections to process
Quality head can send corrections
Investigations
Lab results, Grade A-14
Nothing here yet
Lab results: no rows in this view.