Connected
Quality
Drift
Viscosity drifting up on Line A · Batch mixing
Last 24 runsShaded: since drift began
Lots exposed
Quality head can send corrections
Part weight drifting down on Line B · Moulding
Last 24 runsShaded: since drift began
Lots exposed
Quality head can send corrections
Alarm budget
Illustrative
Raised
7
Budget
12
Left
5
Illustrative note: drift signals count against a weekly budget so quality staff are not flooded. Weaker signals wait in this list rather than alerting.
How a signal is raised
- A property moves the same way across several runs.
- The move is larger than normal run-to-run spread.
- Lots linked to those runs are checked against spec.
- The signal names the line and suggests a correction to Process.