Connected
Activity
Audit log
Events
60
8 in the last 24 h
Decided
20
33% of events
Signed or granted
15
25% of events
Stopped or revoked
10
17% of events
Written
5
8% of events
Exported or drafted
10
17% of events
LineAllLine ALine BActionAllDecidedSigned or grantedStopped or revokedWrittenExported or draftedDayAll20 Oct19 Oct18 Oct17 Oct16 Oct15 Oct
PersonEveryoneOperator B.Shift lead A.Plant head A.Operator C.Quality head A.Process engineer A.Owner A.Operator A.
Events
| Time | Person | Action | Object | Before → after | Line | Source |
|---|---|---|---|---|---|---|
| 18 Oct 21:29 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
| 18 Oct 18:22 | Plant head A.Plant head | Signed trial order | Hold temperature trial, Line A | No value change | Line A | in-app |
| 18 Oct 15:15 | Operator C.Operator | Pressed Stop | Hold temperature trial, Line A | No value change | Line A | in-app |
| 18 Oct 12:08 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 18 Oct 09:01 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 18 Oct 05:54 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 18 Oct 02:47 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
Declined proposal
Illustrative
- When
- 18 Oct 21:29 IST · 41 h ago
- Person
- Shift lead A., Shift lead
- Object
- proposal Melt temperature 236 to 232 °C
- Line
- Line B · Moulding
- Source
- Decided in Stamped
- Reason
- New resin lot on the line
Before and after
This event did not change a value. It records a decision about Melt temperature 236 to 232 °C.
Evidence on the object
- Proposal
- Melt temperature 236 to 232 °C Estimated
- State
- Declined; New resin lot on the line; not changing two things at once.
- Evidence
- EV-B-1988
Other events on this object
- 20 OctDeclined proposalShift lead A. 10:53
- 17 OctDeclined proposalShift lead A. 08:05
- 15 OctDeclined proposalShift lead A. 18:41
- 14 OctDeclined proposalShift lead A. 05:17
By person
| Person | Events | Last |
|---|---|---|
| Plant head A. | 2 | Signed trial order44 h ago |
| Quality head A. | 2 | Confirmed lot link2 d ago |
| Shift lead A. | 1 | Declined proposal41 h ago |
| Operator C. | 1 | Pressed Stop47 h ago |
| Process engineer A. | 1 | Narrowed limit2 d ago |