Connected
Activity
Reports and exports
Reports
| Report | Status | Approved by | Export |
|---|---|---|---|
| Monthly valueSeptember 2026 | Approved | Plant head A. | |
| Trial reportTrial 2 | Approved | Plant head A. | |
| Weekly noteWeek 42 | Awaiting approval | ||
| Audit exportQ3 2026 | Draft |
What each report holds
- Monthly value
- Verified and indicative value items, each with its proof record and evidence label. Kept separate; no total.
- Trial report
- Trial design, switch schedule, stops and restores, and the verdict with its band.
- Weekly note
- Claims from the week with their evidence labels, and decisions taken.
- Audit export
- Every audit event in the period with before and after, person, role and source.
Recent exports
| When | Person | Report | |
|---|---|---|---|
| 19 Oct 13:04 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 17 Oct 23:40 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 16 Oct 10:16 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 14 Oct 20:52 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 13 Oct 07:28 | Owner A.Owner | Monthly value, September 2026 | In audit log |
Approval queue
Illustrative
Weekly note, Week 42Waiting for the plant headAwaiting approval
Audit export, Q3 2026Draft; send for approval when readyDraft
Approved
Monthly value, September 2026Plant head A. · CSV, DOCXApproved
Trial report, Trial 2Plant head A. · HTML, DOCXApproved
Rules for exports
- Approval before export, every time.
- Evidence labels travel with each figure.
- Showcase exports carry the ILLUSTRATIVE tag.
- Each export is written to the audit log.
Preview
Preview · HTML · Illustrative
Weekly note, Week 42
Claims from the week with their evidence labels, and decisions taken.
Week 42 note · 19 Oct
| Three changes verified this quarter, two indicative. | Measured |
Decisions taken
| 20 Oct | Accepted proposal | Cycle time 34.1 to 33.2 s | Operator B. |
| 20 Oct | Declined proposal | Melt temperature 236 to 232 °C | Shift lead A. |
| 20 Oct | Signed trial order | Hold temperature trial, Line A | Plant head A. |
| 20 Oct | Pressed Stop | Hold temperature trial, Line A | Operator C. |
| 19 Oct | Accepted proposal | Cycle time 34.1 to 33.2 s | Operator B. |
| 18 Oct | Declined proposal | Melt temperature 236 to 232 °C | Shift lead A. |
| 18 Oct | Signed trial order | Hold temperature trial, Line A | Plant head A. |
| 18 Oct | Pressed Stop | Hold temperature trial, Line A | Operator C. |
Every figure keeps its evidence label and the ILLUSTRATIVE tag in the export.
Preview
Preview · HTML · Illustrative
Weekly note, Week 42
Claims from the week with their evidence labels, and decisions taken.
Week 42 note · 19 Oct
| Three changes verified this quarter, two indicative. | Measured |
Decisions taken
| 20 Oct | Accepted proposal | Cycle time 34.1 to 33.2 s | Operator B. |
| 20 Oct | Declined proposal | Melt temperature 236 to 232 °C | Shift lead A. |
| 20 Oct | Signed trial order | Hold temperature trial, Line A | Plant head A. |
| 20 Oct | Pressed Stop | Hold temperature trial, Line A | Operator C. |
| 19 Oct | Accepted proposal | Cycle time 34.1 to 33.2 s | Operator B. |
| 18 Oct | Declined proposal | Melt temperature 236 to 232 °C | Shift lead A. |
| 18 Oct | Signed trial order | Hold temperature trial, Line A | Plant head A. |
| 18 Oct | Pressed Stop | Hold temperature trial, Line A | Operator C. |
Every figure keeps its evidence label and the ILLUSTRATIVE tag in the export.