Connected
Activity
Reports and exports
Reports
| Report | Status | Approved by | Export |
|---|---|---|---|
| Monthly valueSeptember 2026 | Approved | Plant head A. | |
| Trial reportTrial 2 | Approved | Plant head A. | |
| Weekly noteWeek 42 | Awaiting approval | ||
| Audit exportQ3 2026 | Draft |
What each report holds
- Monthly value
- Verified and indicative value items, each with its proof record and evidence label. Kept separate; no total.
- Trial report
- Trial design, switch schedule, stops and restores, and the verdict with its band.
- Weekly note
- Claims from the week with their evidence labels, and decisions taken.
- Audit export
- Every audit event in the period with before and after, person, role and source.
Recent exports
| When | Person | Report | |
|---|---|---|---|
| 19 Oct 13:04 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 17 Oct 23:40 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 16 Oct 10:16 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 14 Oct 20:52 | Owner A.Owner | Monthly value, September 2026 | In audit log |
| 13 Oct 07:28 | Owner A.Owner | Monthly value, September 2026 | In audit log |
Approval queue
Illustrative
Weekly note, Week 42Waiting for the plant headAwaiting approval
Audit export, Q3 2026Draft; send for approval when readyDraft
Approved
Monthly value, September 2026Plant head A. · CSV, DOCXApproved
Trial report, Trial 2Plant head A. · HTML, DOCXApproved
Rules for exports
- Approval before export, every time.
- Evidence labels travel with each figure.
- Showcase exports carry the ILLUSTRATIVE tag.
- Each export is written to the audit log.
Preview
Preview · CSV, DOCX · Illustrative
Monthly value, September 2026
Verified and indicative value items, each with its proof record and evidence label. Kept separate; no total.
| Item | Status | Proof |
|---|---|---|
| Shorter cycle on Tool T3Line B | Verified | Cycle time 33.2 s, Line B |
| Hold pressure 720 barLine B | Verified | Hold pressure 720 bar, Line B |
| Jacket flow scheduleLine A | Verified | Jacket flow schedule, Line A |
| Hold temperature 86 °C trialLine A | Indicative | Hold temperature 86 °C, Line A |
| Lot saves from early warningsLine A | Indicative | Lot 3307 viscosity save |
Every figure keeps its evidence label and the ILLUSTRATIVE tag in the export.
Preview
Preview · CSV, DOCX · Illustrative
Monthly value, September 2026
Verified and indicative value items, each with its proof record and evidence label. Kept separate; no total.
| Item | Status | Proof |
|---|---|---|
| Shorter cycle on Tool T3Line B | Verified | Cycle time 33.2 s, Line B |
| Hold pressure 720 barLine B | Verified | Hold pressure 720 bar, Line B |
| Jacket flow scheduleLine A | Verified | Jacket flow schedule, Line A |
| Hold temperature 86 °C trialLine A | Indicative | Hold temperature 86 °C, Line A |
| Lot saves from early warningsLine A | Indicative | Lot 3307 viscosity save |
Every figure keeps its evidence label and the ILLUSTRATIVE tag in the export.