Connected
Process · Injection moulding cell

Line B · Moulding

ProposingHousing B-40 · Tool T3 running, 1,840 parts this shift
Line on plant map

Scrap rate per part

Parts this shift
1,840
Measuredtoday
Scrap rate
3.2%
Measuredtoday
Cycle time
33.6s
Measuredtoday
Open proposals
2
5 in 14 days
Model fit
Accepted
coverage 91%
40
Scrap rateSpec 0 to 4

Shift runs

Shift runs
Shift runEndedMelt temperatureHold pressureCycle timeScrap rateLabelTrial armProof
Shift run 67920 Oct 14:0023672033.23.76 %MeasuredNoneImproved
Shift run 67820 Oct 06:0023672033.23.4 %MeasuredNoneNone
Shift run 67719 Oct 22:0023672033.23.57 %MeasuredNoneNone
Shift run 67619 Oct 14:0023672033.23.3 %MeasuredNoneNone
Shift run 67519 Oct 06:0023672033.23.71 %MeasuredNoneNone
Shift run 67418 Oct 22:0023672033.23.57 %MeasuredNoneNone
Shift run 67318 Oct 14:0023672033.24 %MeasuredNoneNone
Shift run 67218 Oct 06:0023672033.23.65 %MeasuredNoneNone
Shift run 67117 Oct 22:0023672033.23.39 %MeasuredNoneNone
Shift run 67017 Oct 14:0023672033.23.83 %MeasuredNoneNone
Shift run 66917 Oct 06:0023672034.13.42 %MeasuredNoneNone
Shift run 66816 Oct 22:0023672034.13.52 %MeasuredNoneNone
Shift run 66716 Oct 14:0023672034.13.53 %MeasuredNoneNone
Shift run 66616 Oct 06:0023672034.13.74 %MeasuredNoneNone
Shift run 66515 Oct 22:0023672034.13.49 %MeasuredNoneNone
Shift run 66415 Oct 14:0023672034.13.67 %MeasuredNoneNone

Facts

Line pack
Injection moulding cell
Run
One shift run per tool
Window
Per tool, signed per quarter
Signer
Plant head, set per plant
Constraints
Melt temperature under 255 °C; Cycle time at least 28 s
Model
Line model B b-1.6
Standing approval
32.5 to 34.5 s, until 5 Nov; 234 to 240 °C on Tool T3, until 30 Oct
Lease
Connected

Running settings

Melt temperature236 °C
225248
Signed by Plant head A. · 20 Sept
Hold pressure720 bar
600640 to 820 narrowed860
Signed by Plant head A. · 20 Sept · hatched: Stamped narrowing
Cycle time33.2 s
3038
Signed by Plant head A. · 20 Sept

Needs a decision

Process agent·Line B·Press P3·Hold pressure 720 to 760 bar·12:50StayNeeds a decisionexpires in 2 h

Raise hold pressure from 720 to 760 bar

Short shots rose on cavity 2 over the last three shift runs while melt temperature held steady. Higher hold pressure closed the gap in 6 of the 8 best runs.

If stoppedStop keeps 760 bar and writes nothing new. The next value waits for a person.
NoticedProposedWaitingstayMeasuringVerdictHolding
Process agent·Line B·Press P3·Melt temperature 236 to 239 °C·12:00StayNeeds a decisionexpires in 1 h

Raise melt temperature from 236 to 239 °C

Resin lot R-77 dries slower; part weight on the first 200 parts sat at the low edge.

If stoppedStop keeps 239 °C and writes nothing new.
NoticedProposedWaitingstayMeasuringVerdictHolding

Trials