Connected
Process · Line B · Moulding

Shift run 679

Shift run 679 · 20 Oct 06:00 to 14:00 · Housing B-40
PreviousEvidence

Outcomes

Scrap rate
3.76%
Measured
Parts
841parts
Measured
Part weight
47.97g
Measured
Trial arm
None
Normal run
Scrap rate, this and the 12 before
40
Melt temperature during the part

What was set

Setpoints
SettingValueSigned bandSource
Melt temperature236 °C225 to 248prior, written
Hold pressure720 bar640 to 820prior, written
Cycle time33.2 s30 to 38proposal, written

Timeline

  • 06:00Shift run startedHousing B-40
  • 06:00Melt temperature written at 236Source: prior
  • 06:01Hold pressure written at 720Source: prior
  • 06:02Cycle time written at 33.2Source: proposal
  • 14:00Shift run endedScrap rate 3.76 %

Evidence on demand

Cycle time 33.2 s, Line B
ImprovedR4 VerifiedMeasured
Effect Parts per shift +2.6 %, interval 1.9 to 3.3 %.
Why this confidence
Method
Matched runs
Diagnostics
All passed
Open the four questions

Lots from this run

No lot is linked to this run yet.

Line pack words

Run
One shift run per tool
Series
Melt temperature, Hold pressure, Cycle time, Part weight
Outcome
Scrap rate