Connected
Process · Line B · Moulding
Shift run 679
Outcomes
Scrap rate
3.76%
Measured
Parts
841parts
Measured
Part weight
47.97g
Measured
Trial arm
None
Normal run
Scrap rate, this and the 12 before
Melt temperature during the part
What was set
| Setting | Value | Signed band | Source |
|---|---|---|---|
| Melt temperature | 236 °C | 225 to 248 | prior, written |
| Hold pressure | 720 bar | 640 to 820 | prior, written |
| Cycle time | 33.2 s | 30 to 38 | proposal, written |
Timeline
- 06:00Shift run startedHousing B-40
- 06:00Melt temperature written at 236Source: prior
- 06:01Hold pressure written at 720Source: prior
- 06:02Cycle time written at 33.2Source: proposal
- 14:00Shift run endedScrap rate 3.76 %
Evidence on demand
Cycle time 33.2 s, Line B
ImprovedR4 VerifiedMeasured
Effect Parts per shift +2.6 %, interval 1.9 to 3.3 %.
Why this confidence
- Method
- Matched runs
- Diagnostics
- All passed
Lots from this run
No lot is linked to this run yet.
Line pack words
- Run
- One shift run per tool
- Series
- Melt temperature, Hold pressure, Cycle time, Part weight
- Outcome
- Scrap rate