Connected
Process

Trials and stops

A trial alternates the change with the checked prior configuration on a schedule locked before it starts. Stop restores the prior.

Trials

Trials
TrialStatusSwitchesRestore targetPlanSignedVerdict
Hold temperature 84 to 86 °C on Grade A-12Hold temperature trial, Line A · Line Arunning9 done, 1 skippedHold temperature 84Measurement plan for the hold temperature trial, Line APlant head · 15 OctInconclusive
Hold pressure 700 to 720 bar on Tool T3Hold pressure trial, Line B · Line Bfinished12 done, 0 skippedHold pressure 700Measurement plan for the hold pressure trial, Line BPlant head · 23 SeptImproved
Tool temperature 62 to 58 °C on Tool T3Tool temperature trial, Line B · Line Bawaiting signatureNone yettool-temp 62Measurement plan for the hold pressure trial, Line BWaiting for plant headWithheld

Switchback schedule · Hold temperature 84 to 86 °C on Grade A-12

B change2410Written
A prior2411Written
B change2412Written
A prior2413Skipped
B change2414Written
A prior2415Written
B change2416Written
A prior2417Written
B change2418Written
A prior2419Written
BPlanned
APlanned
BPlanned
APlanned
BPlanned
APlanned
B: change appliedA: prior configurationShaded amber: switch skipped and recordedGrey: planned

Waiting for signature

Stops

  • 18 Oct 10:00Restored 84 °C for batch 2409; trial resumed next batch after reviewOperator C. · trial, prior restoredrestored
  • 11 Oct 14:00Kept 720 bar, no new writes for 2 hShift lead A. · stay, value keptnot needed

Holding checks

  • 7 OctMeasurement plan for the hold pressure trial, Line Bnext in 24 hholding
  • 14 OctMeasurement plan for the hold pressure trial, Line Bnext in 24 hholding
  • 19 OctMeasurement plan for the hold temperature trial, Line Anext in 3 dinconclusive