Process engineer A.·Line BNeeds a signature
Tool temperature 62 to 58 °C on Tool T3
Alternate shift runs, 12 runs. Restores 62 on Stop.
| Trial | Status | Switches | Restore target | Plan | Signed | Verdict |
|---|---|---|---|---|---|---|
| Hold temperature 84 to 86 °C on Grade A-12Hold temperature trial, Line A · Line A | running | 9 done, 1 skipped | Hold temperature 84 | Measurement plan for the hold temperature trial, Line A | Plant head · 15 Oct | Inconclusive |
| Hold pressure 700 to 720 bar on Tool T3Hold pressure trial, Line B · Line B | finished | 12 done, 0 skipped | Hold pressure 700 | Measurement plan for the hold pressure trial, Line B | Plant head · 23 Sept | Improved |
| Tool temperature 62 to 58 °C on Tool T3Tool temperature trial, Line B · Line B | awaiting signature | None yet | tool-temp 62 | Measurement plan for the hold pressure trial, Line B | Waiting for plant head | Withheld |
Alternate shift runs, 12 runs. Restores 62 on Stop.