Connected
Trial · Line B · Moulding

Hold pressure 700 to 720 bar on Tool T3

finishedHold pressure trial, Line BDrafted by Process engineer A. · signed by Plant head A. 23 Sept
Evidence

Stop

Stop restores the checked prior configuration, Hold pressure 700 bar, from the next shift run. If the restore fails, the line goes recommend-only.

Switchback schedule

B change648Written
A prior649Written
B change650Written
A prior651Written
B change652Written
A prior653Written
B change654Written
A prior655Written
B change656Written
A prior657Written
B change658Written
A prior659Written
B: change appliedA: prior configurationShaded amber: switch skipped and recordedGrey: planned

Shift runs in this trial

Runs in this trial
RunEndedArmHold pressureScrap ratePartsPart weightSwitch
Shift run 65913 Oct 22:00A, prior720 bar3.17 %819 parts48.17 gWritten
Shift run 65813 Oct 14:00B, change720 bar3.27 %819 parts48.23 gWritten
Shift run 65713 Oct 06:00A, prior720 bar3.49 %819 parts48.19 gWritten
Shift run 65612 Oct 22:00B, change720 bar3.16 %819 parts47.96 gWritten
Shift run 65512 Oct 14:00A, prior720 bar3.62 %819 parts48.15 gWritten
Shift run 65412 Oct 06:00B, change720 bar3.8 %819 parts48.08 gWritten
Shift run 65311 Oct 22:00A, prior720 bar3.81 %819 parts48.27 gWritten
Shift run 65211 Oct 14:00B, change720 bar3.76 %819 parts48.02 gWritten
Shift run 65111 Oct 06:00A, prior720 bar4.1 %819 parts48.05 gWritten
Shift run 65010 Oct 22:00B, change720 bar3.12 %819 parts47.96 gWritten
Shift run 64910 Oct 14:00A, prior720 bar3.32 %819 parts48.29 gWritten
Shift run 64810 Oct 06:00B, change720 bar3.96 %819 parts47.99 gWritten

Skipped switches

Nothing here yet

Skipped switches: no rows in this view.

Stops on this trial

Nothing here yet

Stops: no rows in this view.

Restore target

Hold pressure720 barto 700 bar
600640 to 820 narrowed860
Signed by Plant head A. · 20 SeptStamped narrowingNowProposed
Tick shows the prior value Stop restores.

Measurement plan

Locked
Hash
1b7d09e3
Locked
23 Sept, before the first switch
Minimum
12 shift runs
Measure
Scrap rate (%) Switchback
Open plan

Result so far

ImprovedR3 VerifiedMeasured
Effect Scrap rate -0.6 pp, interval -0.9 to -0.3 pp.
Why this confidence
Method
Plan Measurement plan for the hold pressure trial, Line B
Diagnostics
Balance check passed; Carry-over check passed; Pre-period parallel

Holding check

  • 7 OctChecked againnext in 24 hholding
  • 14 OctChecked againnext in 24 hholding