Connected
Process · Line B · Moulding
Shift run 659
Outcomes
Scrap rate
3.17%
Measured
Parts
819parts
Measured
Part weight
48.17g
Measured
Trial arm
A, prior
Hold pressure trial, Line B
Scrap rate, this and the 12 before
Readings
No sampled readings kept for this run in the demonstration dataset.
What was set
| Setting | Value | Signed band | Source |
|---|---|---|---|
| Melt temperature | 236 °C | 225 to 248 | prior, written |
| Hold pressure | 720 bar | 640 to 820 | prior, written |
| Cycle time | 34.1 s | 30 to 38 | prior, written |
Timeline
- 14:00Shift run startedHousing B-40
- 14:00Melt temperature written at 236Source: prior
- 14:00Trial arm A (prior)Hold pressure 700 to 720 bar on Tool T3
- 14:01Hold pressure written at 720Source: prior
- 14:02Cycle time written at 34.1Source: prior
- 22:00Shift run endedScrap rate 3.17 %
Evidence on demand
Hold pressure 720 bar, Line B
ImprovedR3 VerifiedMeasured
Effect Scrap rate -0.6 pp, interval -0.9 to -0.3 pp.
Why this confidence
- Method
- Plan Measurement plan for the hold pressure trial, Line B
- Diagnostics
- Balance check passed; Carry-over check passed; Pre-period parallel
Lots from this run
No lot is linked to this run yet.
Line pack words
- Run
- One shift run per tool
- Series
- Melt temperature, Hold pressure, Cycle time, Part weight
- Outcome
- Scrap rate