Connected
Process · Line B · Moulding

Shift run 658

Shift run 658 · 13 Oct 06:00 to 14:00 · Housing B-40
PreviousNextEvidence

Outcomes

Scrap rate
3.27%
Measured
Parts
819parts
Measured
Part weight
48.23g
Measured
Trial arm
B, change
Hold pressure trial, Line B
Scrap rate, this and the 12 before
40
Readings

No sampled readings kept for this run in the demonstration dataset.

What was set

Setpoints
SettingValueSigned bandSource
Melt temperature236 °C225 to 248prior, written
Hold pressure720 bar640 to 820prior, written
Cycle time34.1 s30 to 38prior, written

Timeline

  • 06:00Shift run startedHousing B-40
  • 06:00Melt temperature written at 236Source: prior
  • 06:00Trial arm B (change)Hold pressure 700 to 720 bar on Tool T3
  • 06:01Hold pressure written at 720Source: prior
  • 06:02Cycle time written at 34.1Source: prior
  • 14:00Shift run endedScrap rate 3.27 %

Evidence on demand

Hold pressure 720 bar, Line B
ImprovedR3 VerifiedMeasured
Effect Scrap rate -0.6 pp, interval -0.9 to -0.3 pp.
Why this confidence
Method
Plan Measurement plan for the hold pressure trial, Line B
Diagnostics
Balance check passed; Carry-over check passed; Pre-period parallel
Open the four questions

Lots from this run

Lot 7731
verifiedLink0.88approved
Driven by time proximity, recipe match, sequence, scanned id.
Why this confidence
Method
Weights fitted on a verification sample

Line pack words

Run
One shift run per tool
Series
Melt temperature, Hold pressure, Cycle time, Part weight
Outcome
Scrap rate