Connected
Process · Line B · Moulding
Shift run 674
Outcomes
Scrap rate
3.57%
Measured
Parts
841parts
Measured
Part weight
47.93g
Measured
Trial arm
None
Normal run
Scrap rate, this and the 12 before
Melt temperature during the part
What was set
| Setting | Value | Signed band | Source |
|---|---|---|---|
| Melt temperature | 236 °C | 225 to 248 | prior, written |
| Hold pressure | 720 bar | 640 to 820 | prior, written |
| Cycle time | 33.2 s | 30 to 38 | proposal, written |
Timeline
- 14:00Shift run startedHousing B-40
- 14:00Melt temperature written at 236Source: prior
- 14:01Hold pressure written at 720Source: prior
- 14:02Cycle time written at 33.2Source: proposal
- 22:00Shift run endedScrap rate 3.57 %
Evidence on demand
This run is not part of a trial or a measured change, so it has no proof record. It still counts as a normal run in the line's history.
Lots from this run
Lot 7715
estimatedLink0.93suggested
Driven by time proximity, recipe match, sequence, scanned id.
Why this confidence
- Method
- Weights fitted on a verification sample
Line pack words
- Run
- One shift run per tool
- Series
- Melt temperature, Hold pressure, Cycle time, Part weight
- Outcome
- Scrap rate