Connected
Process · Line B · Moulding

Shift run 676

Shift run 676 · 19 Oct 06:00 to 14:00 · Housing B-40
PreviousNext

Outcomes

Scrap rate
3.3%
Measured
Parts
841parts
Measured
Part weight
48.29g
Measured
Trial arm
None
Normal run
Scrap rate, this and the 12 before
40
Melt temperature during the part

What was set

Setpoints
SettingValueSigned bandSource
Melt temperature236 °C225 to 248prior, written
Hold pressure720 bar640 to 820prior, written
Cycle time33.2 s30 to 38proposal, written

Timeline

  • 06:00Shift run startedHousing B-40
  • 06:00Melt temperature written at 236Source: prior
  • 06:01Hold pressure written at 720Source: prior
  • 06:02Cycle time written at 33.2Source: proposal
  • 14:00Shift run endedScrap rate 3.3 %

Evidence on demand

This run is not part of a trial or a measured change, so it has no proof record. It still counts as a normal run in the line's history.

Lots from this run

Lot 7713
estimatedLink0.92suggested
Driven by time proximity, recipe match, sequence, scanned id.
Why this confidence
Method
Weights fitted on a verification sample

Line pack words

Run
One shift run per tool
Series
Melt temperature, Hold pressure, Cycle time, Part weight
Outcome
Scrap rate