60
8 in the last 24 h
Decided
20
33% of events
Signed or granted
15
25% of events
Stopped or revoked
10
17% of events
Written
5
8% of events
Exported or drafted
10
17% of events
LineAllLine ALine BActionAllDecidedSigned or grantedStopped or revokedWrittenExported or draftedDayAll20 Oct19 Oct18 Oct17 Oct16 Oct15 Oct
PersonEveryoneOperator B.Shift lead A.Plant head A.Operator C.Quality head A.Process engineer A.Owner A.Operator A.
Events
| Time | Person | Action | Object | Before → after | Line | Source |
|---|---|---|---|---|---|---|
| 20 Oct 14:00 | Operator B.Operator | Accepted proposal | Cycle time 34.1 to 33.2 s | No value change | Line B | in-app |
| 20 Oct 10:53 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
| 20 Oct 07:46 | Plant head A.Plant head | Signed trial order | Hold temperature trial, Line A | No value change | Line A | in-app |
| 20 Oct 04:39 | Operator C.Operator | Pressed Stop | Hold temperature trial, Line A | No value change | Line A | in-app |
| 20 Oct 01:32 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 19 Oct 22:25 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 19 Oct 19:18 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 19 Oct 16:11 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
| 19 Oct 13:04 | Owner A.Owner | Exported report | Monthly value, September 2026 | No value change | Plant | in-app |
| 19 Oct 09:57 | Shift lead A.Shift lead | Revoked lease | Lease issued 11/10 14:00 | No value change | Plant | in-app |
| 19 Oct 06:50 | Operator A.Operator | Setpoint written | Batch 2417 | No value change | Line A | system |
| 19 Oct 03:43 | Process engineer A.Process engineer | Drafted trial | Tool temperature trial, Line B | No value change | Line B | in-app |
| 19 Oct 00:36 | Operator B.Operator | Accepted proposal | Cycle time 34.1 to 33.2 s | No value change | Line B | in-app |
| 18 Oct 21:29 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
| 18 Oct 18:22 | Plant head A.Plant head | Signed trial order | Hold temperature trial, Line A | No value change | Line A | in-app |
| 18 Oct 15:15 | Operator C.Operator | Pressed Stop | Hold temperature trial, Line A | No value change | Line A | in-app |
| 18 Oct 12:08 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 18 Oct 09:01 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 18 Oct 05:54 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 18 Oct 02:47 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
| 17 Oct 23:40 | Owner A.Owner | Exported report | Monthly value, September 2026 | No value change | Plant | in-app |
| 17 Oct 20:33 | Shift lead A.Shift lead | Revoked lease | Lease issued 11/10 14:00 | No value change | Plant | in-app |
| 17 Oct 17:26 | Operator A.Operator | Setpoint written | Batch 2417 | No value change | Line A | system |
| 17 Oct 14:19 | Process engineer A.Process engineer | Drafted trial | Tool temperature trial, Line B | No value change | Line B | in-app |
| 17 Oct 11:12 | Operator B.Operator | Accepted proposal | Cycle time 34.1 to 33.2 s | No value change | Line B | in-app |
| 17 Oct 08:05 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
| 17 Oct 04:58 | Plant head A.Plant head | Signed trial order | Hold temperature trial, Line A | No value change | Line A | in-app |
| 17 Oct 01:51 | Operator C.Operator | Pressed Stop | Hold temperature trial, Line A | No value change | Line A | in-app |
| 16 Oct 22:44 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 16 Oct 19:37 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 16 Oct 16:30 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 16 Oct 13:23 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
| 16 Oct 10:16 | Owner A.Owner | Exported report | Monthly value, September 2026 | No value change | Plant | in-app |
| 16 Oct 07:09 | Shift lead A.Shift lead | Revoked lease | Lease issued 11/10 14:00 | No value change | Plant | in-app |
| 16 Oct 04:02 | Operator A.Operator | Setpoint written | Batch 2417 | No value change | Line A | system |
| 16 Oct 00:55 | Process engineer A.Process engineer | Drafted trial | Tool temperature trial, Line B | No value change | Line B | in-app |
| 15 Oct 21:48 | Operator B.Operator | Accepted proposal | Cycle time 34.1 to 33.2 s | No value change | Line B | in-app |
| 15 Oct 18:41 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
| 15 Oct 15:34 | Plant head A.Plant head | Signed trial order | Hold temperature trial, Line A | No value change | Line A | in-app |
| 15 Oct 12:27 | Operator C.Operator | Pressed Stop | Hold temperature trial, Line A | No value change | Line A | in-app |
| 15 Oct 09:20 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 15 Oct 06:13 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 15 Oct 03:06 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 14 Oct 23:59 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
| 14 Oct 20:52 | Owner A.Owner | Exported report | Monthly value, September 2026 | No value change | Plant | in-app |
| 14 Oct 17:45 | Shift lead A.Shift lead | Revoked lease | Lease issued 11/10 14:00 | No value change | Plant | in-app |
| 14 Oct 14:38 | Operator A.Operator | Setpoint written | Batch 2417 | No value change | Line A | system |
| 14 Oct 11:31 | Process engineer A.Process engineer | Drafted trial | Tool temperature trial, Line B | No value change | Line B | in-app |
| 14 Oct 08:24 | Operator B.Operator | Accepted proposal | Cycle time 34.1 to 33.2 s | No value change | Line B | in-app |
| 14 Oct 05:17 | Shift lead A.Shift lead | Declined proposal | Melt temperature 236 to 232 °C | No value change | Line B | in-app |
Showing 50 of 60Show 25 more
Confirmed lot link
Illustrative
- When
- 15 Oct 09:20 IST · 5 d ago
- Person
- Quality head A., Quality head
- Object
- lot Lot 3296
- Line
- Line A · Batch mixing
- Source
- Decided in Stamped
Before and after
This event did not change a value. It records a decision about Lot 3296.
Other events on this object
- 20 OctConfirmed lot linkQuality head A. 01:32
- 18 OctConfirmed lot linkQuality head A. 12:08
- 16 OctConfirmed lot linkQuality head A. 22:44
- 13 OctConfirmed lot linkQuality head A. 19:56
By person
| Person | Events | Last |
|---|---|---|
| Shift lead A. | 10 | Declined proposal3 h ago |
| Plant head A. | 10 | Signed trial order6 h ago |
| Quality head A. | 10 | Confirmed lot link12 h ago |
| Process engineer A. | 10 | Narrowed limit19 h ago |
| Operator B. | 5 | Accepted proposalin 0 min |
| Operator C. | 5 | Pressed Stop9 h ago |
| Owner A. | 5 | Exported report25 h ago |
| Operator A. | 5 | Setpoint written31 h ago |