Connected
Activity

Audit log

Who approved, overrode, stopped and signed, with before and after. Read only; entries cannot be edited or removed.
Export audit extract

Events

Audit events
TimePersonActionObjectBefore → afterLineSource
17 Oct 23:40Owner A.OwnerExported reportMonthly value, September 2026No value changePlantin-app
17 Oct 20:33Shift lead A.Shift leadRevoked leaseLease issued 11/10 14:00No value changePlantin-app
17 Oct 17:26Operator A.OperatorSetpoint writtenBatch 2417No value changeLine Asystem
17 Oct 14:19Process engineer A.Process engineerDrafted trialTool temperature trial, Line BNo value changeLine Bin-app
17 Oct 11:12Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app
17 Oct 08:05Shift lead A.Shift leadDeclined proposalMelt temperature 236 to 232 °CNo value changeLine Bin-app
17 Oct 04:58Plant head A.Plant headSigned trial orderHold temperature trial, Line ANo value changeLine Ain-app
17 Oct 01:51Operator C.OperatorPressed StopHold temperature trial, Line ANo value changeLine Ain-app

Signed trial order

Illustrative
When
17 Oct 04:58 IST · 3 d ago
Person
Plant head A., Plant head
Object
trial Hold temperature trial, Line A
Line
Line A · Batch mixing
Source
Decided in Stamped

Before and after

This event did not change a value. It records a decision about Hold temperature trial, Line A.

Evidence on the object

Trial
Hold temperature 84 to 86 °C on Grade A-12

Other events on this object

By person

By person
PersonEventsLast
Shift lead A.2Revoked lease3 d ago
Operator B.1Accepted proposal3 d ago
Plant head A.1Signed trial order3 d ago
Operator C.1Pressed Stop4 d ago
Process engineer A.1Drafted trial3 d ago
Owner A.1Exported report3 d ago
Operator A.1Setpoint written3 d ago