The optimiser computes the number inside the signed window; the agent explains it. People with the right accept, adjust in band or decline.
Process agent·Line B·Tool T3·Melt temperature 236 to 232 °C·14:00StayDeclined

Lower melt temperature from 236 to 232 °C

Lower melt temperature to save heater energy.

Expected result
EstimatedScrap rate3.5 %90% interval 3 to 4.1
Spec 0 to 4 % (dashed). Driven by Melt temperature, Tool temperature.
Why this confidence
Method
Optimiser opt 2.3.9; band from the model of the machine; weakest input estimated
Model fit
Accepted, four checks passed
Safety filter
Passed: Inside signed band
Evidence
EV-B-1988
Limits
Melt temperature236 °Cto 232 °C
225248
Signed by Plant head A. · 20 SeptNowProposed
If stoppedNothing was written.
DeclinedShift lead A.: New resin lot on the line; not changing two things at once.
NoticedProposedWaitingDeclined

All proposals, 14 days

All proposals
ProposalSettingStateModeWeakestRaised
Melt temperature 236 to 232 °CMelt temperatureLine B · 236 to 232DeclinedStayEstimated16 Oct 14:00
Hold pressure 720 to 760 barHold pressureLine B · 720 to 760WaitingStayEstimated20 Oct 12:50
Melt temperature 236 to 239 °CMelt temperatureLine B · 236 to 239WaitingStayEstimated20 Oct 12:00
Cycle time 34.1 to 33.2 sCycle timeLine B · 34.1 to 33.2MeasuringStayMeasured19 Oct 14:00
Hold pressure 700 to 720 barHold pressureLine B · 700 to 720HoldingStayMeasured8 Oct 14:00