Connected
Activity

Audit log

Who approved, overrode, stopped and signed, with before and after. Read only; entries cannot be edited or removed.
Export audit extract

Events

Audit events
TimePersonActionObjectBefore → afterLineSource
19 Oct 22:25Quality head A.Quality headSent correctionRaise agitator speed for lot 3307No value changeLine Ain-app
19 Oct 19:18Process engineer A.Process engineerNarrowed limitHold temperature window, Line A78 to 92 °C80 to 90 °CLine Ain-app
19 Oct 16:11Plant head A.Plant headGranted standing approvalCycle time approval, Line BNo value changeLine Bin-app
19 Oct 13:04Owner A.OwnerExported reportMonthly value, September 2026No value changePlantin-app
19 Oct 09:57Shift lead A.Shift leadRevoked leaseLease issued 11/10 14:00No value changePlantin-app
19 Oct 06:50Operator A.OperatorSetpoint writtenBatch 2417No value changeLine Asystem
19 Oct 03:43Process engineer A.Process engineerDrafted trialTool temperature trial, Line BNo value changeLine Bin-app
19 Oct 00:36Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app

Drafted trial

Illustrative
When
19 Oct 03:43 IST · 34 h ago
Person
Process engineer A., Process engineer
Object
trial Tool temperature trial, Line B
Line
Line B · Moulding
Source
Decided in Stamped

Before and after

This event did not change a value. It records a decision about Tool temperature trial, Line B.

Evidence on the object

Trial
Tool temperature 62 to 58 °C on Tool T3

Other events on this object

By person

By person
PersonEventsLast
Process engineer A.2Narrowed limit19 h ago
Operator B.1Accepted proposal37 h ago
Shift lead A.1Revoked lease28 h ago
Plant head A.1Granted standing approval22 h ago
Quality head A.1Sent correction16 h ago
Owner A.1Exported report25 h ago
Operator A.1Setpoint written31 h ago