Connected
Activity

Audit log

Who approved, overrode, stopped and signed, with before and after. Read only; entries cannot be edited or removed.
Export audit extract

Events

Audit events
TimePersonActionObjectBefore → afterLineSource
15 Oct 21:48Operator B.OperatorAccepted proposalCycle time 34.1 to 33.2 sNo value changeLine Bin-app
15 Oct 18:41Shift lead A.Shift leadDeclined proposalMelt temperature 236 to 232 °CNo value changeLine Bin-app
15 Oct 15:34Plant head A.Plant headSigned trial orderHold temperature trial, Line ANo value changeLine Ain-app
15 Oct 12:27Operator C.OperatorPressed StopHold temperature trial, Line ANo value changeLine Ain-app
15 Oct 09:20Quality head A.Quality headConfirmed lot linkLot 3296No value changeLine Ain-app
15 Oct 06:13Quality head A.Quality headSent correctionRaise agitator speed for lot 3307No value changeLine Ain-app
15 Oct 03:06Process engineer A.Process engineerNarrowed limitHold temperature window, Line A78 to 92 °C80 to 90 °CLine Ain-app

Accepted proposal

Illustrative
When
20 Oct 14:00 IST · in 0 min
Person
Operator B., Operator
Object
proposal Cycle time 34.1 to 33.2 s
Line
Line B · Moulding
Source
Decided in Stamped

Before and after

This event did not change a value. It records a decision about Cycle time 34.1 to 33.2 s.

Evidence on the object

Proposal
Cycle time 34.1 to 33.2 s Measured
State
Measuring
Evidence
EV-B-2101

Other events on this object

By person

By person
PersonEventsLast
Quality head A.2Confirmed lot link5 d ago
Operator B.1Accepted proposal5 d ago
Shift lead A.1Declined proposal5 d ago
Plant head A.1Signed trial order5 d ago
Operator C.1Pressed Stop5 d ago
Process engineer A.1Narrowed limit5 d ago