Connected
Settings

Plant setup

The site, its areas, lines and shifts, and the units and language the plant works in.

Save plant setup

Changes to shifts apply from the next shift start.

Illustrative: nothing is changed in this demonstration.

Settings

Every change here is illustrative in the demonstration plant. Nothing is saved.

About this setting

Illustrative
  • Lines take their words from their line pack.
  • Shift times drive handovers and notes.
  • Units are metric for this site.

Who can change this

Manage people, roles and routingPlant head, Stamped engineer

History

  • 20 OctSigned trial order · Hold temperature trial, Line APlant head 07:46
  • 18 OctSigned trial order · Hold temperature trial, Line APlant head 18:22
  • 17 OctSigned trial order · Hold temperature trial, Line APlant head 04:58
  • 15 OctSigned trial order · Hold temperature trial, Line APlant head 15:34
  • 14 OctSigned trial order · Hold temperature trial, Line APlant head 02:10

Needs attention

Recent changes

  • 20 OctAccepted proposalOperator 14:00
  • 20 OctDeclined proposalShift lead 10:53
  • 20 OctSigned trial orderPlant head 07:46
  • 20 OctPressed StopOperator 04:39
  • 20 OctConfirmed lot linkQuality head 01:32
  • 19 OctSent correctionQuality head 22:25

Site

Areas and lines

Lines
AreaLineTypePackMode
Mixing hallLine A · Batch mixingbatchpack-batch-mixerTrial
Moulding shopLine B · Mouldingdiscretepack-mouldingProposing

Add a line

Pick an area and a line pack. The line starts in watch-only mode.

Illustrative: nothing is changed in this demonstration.

Shifts

Areas

Areas
AreaLinesAssets
Mixing hallLine A5
Moulding shopLine B5
UtilitiesNone yet0

Plant Box

Box
LeaseStateLimits
Lease issued 20/10 08:00active4 h, cap 8 h
Lease issued 19/10 08:00expired4 h, cap 8 h
Lease issued 11/10 14:00revoked4 h, cap 8 h

About this setting

Illustrative
  • Lines take their words from their line pack.
  • Shift times drive handovers and notes.
  • Units are metric for this site.

Who can change this

Manage people, roles and routingPlant head, Stamped engineer

History

  • 20 OctSigned trial order · Hold temperature trial, Line APlant head 07:46
  • 18 OctSigned trial order · Hold temperature trial, Line APlant head 18:22
  • 17 OctSigned trial order · Hold temperature trial, Line APlant head 04:58
  • 15 OctSigned trial order · Hold temperature trial, Line APlant head 15:34
  • 14 OctSigned trial order · Hold temperature trial, Line APlant head 02:10