Connected
Settings
Routing and notifications
Settings
Every change here is illustrative in the demonstration plant. Nothing is saved.
About this setting
Illustrative
- Cards go to the primary first, then backups in order.
- Recommend suggests backups by scope and skills.
- Channels are in-app and email.
Who can change this
Manage people, roles and routingPlant head, Stamped engineer
History
- 20 OctAccepted proposal · Cycle time 34.1 to 33.2 sOperator 14:00
- 20 OctDeclined proposal · Melt temperature 236 to 232 °CShift lead 10:53
- 20 OctPressed Stop · Hold temperature trial, Line AOperator 04:39
- 19 OctAccepted proposal · Cycle time 34.1 to 33.2 sOperator 00:36
- 18 OctDeclined proposal · Melt temperature 236 to 232 °CShift lead 21:29
Needs attention
Line A standing approval expires 22 OctWebhook failing: quality.example.invalidReceiver returns 503 since 05:00; 14 deliveries queued for retry.Webhook paused: reports.example.invalidPaused by Plant head A. while the reporting system moves.Lab system degradedLine meters degradedPlant ERP export not connected
Recent changes
- 20 OctAccepted proposalOperator 14:00
- 20 OctDeclined proposalShift lead 10:53
- 20 OctSigned trial orderPlant head 07:46
- 20 OctPressed StopOperator 04:39
- 20 OctConfirmed lot linkQuality head 01:32
- 19 OctSent correctionQuality head 22:25
Assignment matrix
P primary, B backup. Click to set primary; Alt-click to toggle a backup.
| Scope | Op. A. | Op. B. | Op. C. | Op. D. | Shift lead A. | Proc. eng. A. | Quality A. | Plant head A. | Skills | |
|---|---|---|---|---|---|---|---|---|---|---|
| Line A · Batch mixing | Batch mixer, Recipe changes | |||||||||
| Line B · Moulding | Moulding, Tool change | |||||||||
| Mixing hall | Trials | |||||||||
| Moulding shop | Trials | |||||||||
| Quality | Lot links, Specs |
Notifications
| Event | Role | Channel |
|---|---|---|
| Proposal waiting | Operator | in-app |
| Trial needs signature | Plant head | |
| Lot at risk | Quality head | in-app |
| Stop pressed | Shift lead | in-app |
| Weekly note | Owner |
What waits, and for whom
| Item | Owner |
|---|---|
| Raise hold pressure to 760 bar on Press P3 | Operator |
| Raise agitator speed to 158 rpm on Mixer M1 | Operator |
| Raise melt temperature to 239 °C for resin lot R-77 | Operator |
| Sign trial: tool temperature 58 °C on Tool T3 | Plant head |
| Correction from Quality: lot 3307 viscosity | Process engineer |
| Confirm link: lot 3292 to its batch | Quality head |
| Confirm link: lot 7715 to its shift run | Quality head |
| Lab results missing for lots 3301 to 3305 | Stamped engineer |
About this setting
Illustrative
- Cards go to the primary first, then backups in order.
- Recommend suggests backups by scope and skills.
- Channels are in-app and email.
Who can change this
Manage people, roles and routingPlant head, Stamped engineer
History
- 20 OctAccepted proposal · Cycle time 34.1 to 33.2 sOperator 14:00
- 20 OctDeclined proposal · Melt temperature 236 to 232 °CShift lead 10:53
- 20 OctPressed Stop · Hold temperature trial, Line AOperator 04:39
- 19 OctAccepted proposal · Cycle time 34.1 to 33.2 sOperator 00:36
- 18 OctDeclined proposal · Melt temperature 236 to 232 °CShift lead 21:29