Measurement plans and holding check
Plans
How the holding check works
After a verdict, the same measures are checked again on later runs. The result is one of three words: holding, faded or inconclusive. A faded result reopens the change for review; it never undoes a value by itself.
Holding check
- 14 OctEffect still thereholding
- 7 OctEffect still thereholding
All holding checks
| Plan | Checked | Result |
|---|---|---|
| Measurement plan for the hold pressure trial, Line B | 7 Oct | holding |
| Measurement plan for the hold pressure trial, Line B | 14 Oct | holding |
| Measurement plan for the hold temperature trial, Line A | 19 Oct | inconclusive |
Hold pressure 700 to 720 bar on Tool T3
Locked 23 Sept
Line
Line B
Housing B-40
Minimum
12shift runs
before a verdict
So far
12shift runs
0 to go
Verdict
Improved
R3 Verified
| Measure | Unit | Method |
|---|---|---|
| Scrap rate | % | Switchbackshift level |
Trial this plan judges
- Trial
- Hold pressure trial, Line B
- Schedule
- Alternate shift runs, 12 runs
- Restore
- Hold pressure 700
- Drafted
- Process engineer A.
- Signed
- Plant head A. · 23 Sept
- Proof
- Hold pressure 720 bar, Line B, open the four questions
Switches so far
B: change appliedA: prior configurationShaded amber: switch skipped and recordedGrey: planned
Holding check
- 14 OctEffect still thereholding
- 7 OctEffect still thereholding
All holding checks
| Plan | Checked | Result |
|---|---|---|
| Measurement plan for the hold pressure trial, Line B | 7 Oct | holding |
| Measurement plan for the hold pressure trial, Line B | 14 Oct | holding |
| Measurement plan for the hold temperature trial, Line A | 19 Oct | inconclusive |