Connected
Plant

Plant map

2 lines in process order. Grey when normal; colour only when something is abnormal or on trial.
Line A · Batches today7Line A · Right first time91.4 %Line A · Energy per batch412 kWh
FlowGridOnly items needing attention (6)ActWatchTrialNo mark: normalSigned bandIllustrative

Needs attention

Needs attention
AssetStatusWhyOpen decisions
Mixer M1Line ANormalDecision waiting2
Jacket loopLine A · on Mixer M1NormalDecision waiting1
Hold tank H1Line ATrialViscosity drifting up, +38 mPa·s over 9 batches; Hold temperature on trial at 86 °C
Press P3Line BNormalDecision waiting2
Take-out robotLine BNormal
Vision checkLine B · on Take-out robotWatchPart weight drifting down, -0.12 g over 3 shift runs

Running settings on all lines

Running settings
SettingValueBandModeWritten
Hold temperatureLine A86 °C80 to 90Trial3 h ago
Hold timeLine A55 min40 to 70Stay6 d ago
Agitator speedLine A150 rpm130 to 170Stay6 d ago
Melt temperatureLine B236 °C225 to 248Stay9 d ago
Hold pressureLine B720 bar640 to 820Stay9 d ago
Cycle timeLine B33.2 s30 to 38Stay5 h ago

Mixer M1

Normal

All readings inside their bands.

Explore asset
Tags
TagTrendLast
Agitator speedband 130 to 170 rpm149 rpm
Torqueno signed band409 N·m
Batch temperatureno signed band84.0 °C

Running settings

Agitator speed150 rpm · band 130 to 170Stay

Last 3 events

  • 13:20Agitator speed proposal on Mixer M1
  • 12:30Lot 3307 flagged at risk on viscosity
  • 11:00Batch 2417 written at 86 °C (trial arm B)

Open decisions

Since this morning

  • 13:20Agitator speed proposal on Mixer M1Line A
  • 12:50Hold pressure proposal on Press P3Line B
  • 12:30Lot 3307 flagged at risk on viscosityLine A
  • 12:00Melt temperature proposal for resin lot R-77Line B
  • 11:00Batch 2417 written at 86 °C (trial arm B)Line A
  • 09:45Lab results late from the lab system; 4 lots unanchoredLine A