Connected
Activity
Audit log
Events
60
8 in the last 24 h
Decided
20
33% of events
Signed or granted
15
25% of events
Stopped or revoked
10
17% of events
Written
5
8% of events
Exported or drafted
10
17% of events
LineAllLine ALine BActionAllDecidedSigned or grantedStopped or revokedWrittenExported or draftedDayAll20 Oct19 Oct18 Oct17 Oct16 Oct15 Oct
PersonEveryoneOperator B.Shift lead A.Plant head A.Operator C.Quality head A.Process engineer A.Owner A.Operator A.
Events
| Time | Person | Action | Object | Before → after | Line | Source |
|---|---|---|---|---|---|---|
| 16 Oct 22:44 | Quality head A.Quality head | Confirmed lot link | Lot 3296 | No value change | Line A | in-app |
| 16 Oct 19:37 | Quality head A.Quality head | Sent correction | Raise agitator speed for lot 3307 | No value change | Line A | in-app |
| 16 Oct 16:30 | Process engineer A.Process engineer | Narrowed limit | Hold temperature window, Line A | Line A | in-app | |
| 16 Oct 13:23 | Plant head A.Plant head | Granted standing approval | Cycle time approval, Line B | No value change | Line B | in-app |
| 16 Oct 10:16 | Owner A.Owner | Exported report | Monthly value, September 2026 | No value change | Plant | in-app |
| 16 Oct 07:09 | Shift lead A.Shift lead | Revoked lease | Lease issued 11/10 14:00 | No value change | Plant | in-app |
| 16 Oct 04:02 | Operator A.Operator | Setpoint written | Batch 2417 | No value change | Line A | system |
| 16 Oct 00:55 | Process engineer A.Process engineer | Drafted trial | Tool temperature trial, Line B | No value change | Line B | in-app |
Narrowed limit
Illustrative
- When
- 18 Oct 05:54 IST · 2 d ago
- Person
- Process engineer A., Process engineer
- Object
- window Hold temperature window, Line A
- Line
- Line A · Batch mixing
- Source
- Decided in Stamped
Before and after
Before
78 to 92 °C
After
80 to 90 °C
Evidence on the object
- Window
- Hold temperature: 78 to 92 °C, signed by Plant head A., v3
Other events on this object
- 19 OctNarrowed limitProcess engineer A. 19:18
- 16 OctNarrowed limitProcess engineer A. 16:30
- 15 OctNarrowed limitProcess engineer A. 03:06
- 13 OctNarrowed limitProcess engineer A. 13:42
By person
| Person | Events | Last |
|---|---|---|
| Quality head A. | 2 | Confirmed lot link4 d ago |
| Process engineer A. | 2 | Narrowed limit4 d ago |
| Shift lead A. | 1 | Revoked lease4 d ago |
| Plant head A. | 1 | Granted standing approval4 d ago |
| Owner A. | 1 | Exported report4 d ago |
| Operator A. | 1 | Setpoint written4 d ago |