Value and what happened

Value at the plant's own prices. Verified and Indicative are shown apart and never added.
Plant head view

Value by week

Illustrative
114kW35W36W37W38W39W40W41W42
VerifiedIndicative

Where the value comes from

Value items
ChangeLineStatusBasisPer monthProof
Shorter cycle on Tool T3Line BVerified R42.6% more parts per shift × contribution per part₹2,14,000Evidence
Hold pressure 720 barLine BVerified R30.6 pp less scrap × scrapped part price₹1,38,000Evidence
Jacket flow scheduleLine AVerified R33.8% less energy per batch × electricity price₹96,000Evidence
Hold temperature 86 °C trialLine AIndicative R2Faster batches, if the trial holds; interval includes zero₹1,72,000Evidence
Lot saves from early warningsLine AIndicative R2Two batches not reworked × rework price; lab results pending₹92,000Evidence

Plant-wide context

What happened recently

20 Oct 14:00Operator B. accepted proposal Cycle time 34.1 to 33.2 sin 0 min
20 Oct 10:53Shift lead A. declined proposal Melt temperature 236 to 232 °C3 h ago
20 Oct 07:46Plant head A. signed trial order Hold temperature trial, Line A6 h ago
20 Oct 04:39Operator C. pressed stop Hold temperature trial, Line A9 h ago
20 Oct 01:32Quality head A. confirmed lot link Lot 329612 h ago
19 Oct 22:25Quality head A. sent correction Raise agitator speed for lot 330716 h ago
19 Oct 19:18Process engineer A. narrowed limit Hold temperature window, Line A19 h ago