Connected
Home

Shift 2, starting

Shift 1 handed over at 14:00 IST. Here is what changed and what is waiting.
Plant head view
Accepted last shift
2
1 under standing approval
Stops last 7 days
2
Last: Operator C., 2 d ago
Plant Box lease
Connected
At most 4 h offline, then recommend-only

Shift 1 timeline

  1. 13:20Line A · Agitator speed proposal on Mixer M1
  2. 12:50Line B · Hold pressure proposal on Press P3
  3. 12:30Line A · Lot 3307 flagged at risk on viscosity
  4. 12:00Line B · Melt temperature proposal for resin lot R-77
  5. 11:00Line A · Batch 2417 written at 86 °C (trial arm B)
  6. 09:45Line A · Lab results late from the lab system; 4 lots unanchored
  7. 09:00Line B · Cycle time 33.2 s accepted by Operator B. under standing approval
  8. 07:40Line B · Withheld proposal for Grade A-14: model fit not accepted
  9. 06:10Line A · Shift 1 started, handover read by Shift lead A.

Running settings

Running settings
LineSettingValueBandModeWritten
Line AHold temperature86 °C80 to 90Trial3 h ago
Line AHold time55 min40 to 70Stay6 d ago
Line AAgitator speed150 rpm130 to 170Stay6 d ago
Line BMelt temperature236 °C225 to 248Stay9 d ago
Line BHold pressure720 bar640 to 820Stay9 d ago
Line BCycle time33.2 s30 to 38Stay5 h ago