Connected
Ask

Handover and weekly note

Drafted by Stamped from the shift's records; every claim cites its evidence. A person reads and sends it.
Export via Activity

Week 41 note

Measured

What changed

  1. Hold pressure 720 bar on Tool T3 verified at R3, with less scrap holding at both checks.EV-B-1902Measured
  2. Hold temperature trial on Line A signed and started.EV-A-1102Measured

Decisions taken

Decisions
ActionOnRoleAt
Accepted proposalCycle time 34.1 to 33.2 soperator20 Oct 14:00
Declined proposalMelt temperature 236 to 232 °Cshift-lead20 Oct 10:53
Signed trial orderHold temperature trial, Line Aplant-head20 Oct 07:46
Pressed StopHold temperature trial, Line Aoperator20 Oct 04:39
Confirmed lot linkLot 3296quality-head20 Oct 01:32
Sent correctionRaise agitator speed for lot 3307quality-head19 Oct 22:25
Accepted proposalCycle time 34.1 to 33.2 soperator19 Oct 00:36
Declined proposalMelt temperature 236 to 232 °Cshift-lead18 Oct 21:29

Cited items

Shift events used

  • 09:00Cycle time 33.2 s accepted by Operator B. under standing approval
  • 09:45Lab results late from the lab system; 4 lots unanchored
  • 11:00Batch 2417 written at 86 °C (trial arm B)
  • 12:00Melt temperature proposal for resin lot R-77
  • 12:30Lot 3307 flagged at risk on viscosity
  • 12:50Hold pressure proposal on Press P3
  • 13:20Agitator speed proposal on Mixer M1

How it is drafted

  • From shift events, cards and proof records
  • Uncited numbers are removed
  • The person sending it can edit before export