Connected
Ask

Handover and weekly note

Drafted by Stamped from the shift's records; every claim cites its evidence. A person reads and sends it.
Export via Activity

Week 42 note

Measured

What changed

  1. Three changes verified this quarter, two indicative.EV-B-2101Measured

Decisions taken

Decisions
ActionOnRoleAt
Accepted proposalCycle time 34.1 to 33.2 soperator20 Oct 14:00
Declined proposalMelt temperature 236 to 232 °Cshift-lead20 Oct 10:53
Signed trial orderHold temperature trial, Line Aplant-head20 Oct 07:46
Pressed StopHold temperature trial, Line Aoperator20 Oct 04:39
Confirmed lot linkLot 3296quality-head20 Oct 01:32
Sent correctionRaise agitator speed for lot 3307quality-head19 Oct 22:25
Accepted proposalCycle time 34.1 to 33.2 soperator19 Oct 00:36
Declined proposalMelt temperature 236 to 232 °Cshift-lead18 Oct 21:29

Cited items

Shift events used

  • 09:00Cycle time 33.2 s accepted by Operator B. under standing approval
  • 09:45Lab results late from the lab system; 4 lots unanchored
  • 11:00Batch 2417 written at 86 °C (trial arm B)
  • 12:00Melt temperature proposal for resin lot R-77
  • 12:30Lot 3307 flagged at risk on viscosity
  • 12:50Hold pressure proposal on Press P3
  • 13:20Agitator speed proposal on Mixer M1

How it is drafted

  • From shift events, cards and proof records
  • Uncited numbers are removed
  • The person sending it can edit before export