Connected
Ask
Handover and weekly note
Notes
Shift handovers · 3
Shifts
- Shift 1
- 06:00 to 14:00
- Shift 2
- 14:00 to 22:00
- Shift 3
- 22:00 to 06:00
Shift 1 to Shift 2
Estimated
What changed
- Hold temperature trial on batch 10 of 16.EV-A-1131Measured
- Lot 3307 at risk, correction sent to Process.EV-A-1188Estimated
What waits
Decisions taken
| Action | On | Role | At |
|---|---|---|---|
| Accepted proposal | Cycle time 34.1 to 33.2 s | operator | 20 Oct 14:00 |
| Declined proposal | Melt temperature 236 to 232 °C | shift-lead | 20 Oct 10:53 |
| Signed trial order | Hold temperature trial, Line A | plant-head | 20 Oct 07:46 |
| Pressed Stop | Hold temperature trial, Line A | operator | 20 Oct 04:39 |
| Confirmed lot link | Lot 3296 | quality-head | 20 Oct 01:32 |
Cited items
Shift events used
- 09:00Cycle time 33.2 s accepted by Operator B. under standing approval
- 09:45Lab results late from the lab system; 4 lots unanchored
- 11:00Batch 2417 written at 86 °C (trial arm B)
- 12:00Melt temperature proposal for resin lot R-77
- 12:30Lot 3307 flagged at risk on viscosity
- 12:50Hold pressure proposal on Press P3
- 13:20Agitator speed proposal on Mixer M1
How it is drafted
- From shift events, cards and proof records
- Uncited numbers are removed
- The person sending it can edit before export