Connected
Home

My line now

Current settings inside the signed band, and the next proposal.
Plant head view
Line A · Batch mixingLine B · MouldingHousing B-40 · Tool T3 running, 1,840 parts this shiftProposing
Process agent·Line B·Press P3·Hold pressure 720 to 760 bar·12:50StayNeeds a decisionexpires in 2 h

Raise hold pressure from 720 to 760 bar

Short shots rose on cavity 2 over the last three shift runs while melt temperature held steady. Higher hold pressure closed the gap in 6 of the 8 best runs.

Expected result
EstimatedScrap rate2.8 %90% interval 2.4 to 3.3
Spec 0 to 4 % (dashed). Driven by Cavity 2 pressure trend, Part weight on cavity 2, Tool temperature.
Why this confidence
Method
Optimiser opt 2.4.1; band from the model of the machine; weakest input estimated
Model fit
Accepted, four checks passed
Safety filter
Passed: Inside narrowed band 640 to 820 bar; Clamp force margin over 12%
Evidence
EV-B-2201, EV-B-2207, EV-B-2214
Limits
Hold pressure720 barto 760 bar
600640 to 820 narrowed860
Signed by Plant head A. · 20 SeptStamped narrowingNowProposed
If stoppedStop keeps 760 bar and writes nothing new. The next value waits for a person.
NoticedProposedWaitingstayMeasuringVerdictHolding

Current settings

Melt temperature236 °C
225248
Signed by Plant head A. · 20 Sept
Staywritten 9 d ago
Hold pressure720 bar
600640 to 820 narrowed860
Signed by Plant head A. · 20 Sept · hatched: Stamped narrowing
Staywritten 9 d ago
Cycle time33.2 s
3038
Signed by Plant head A. · 20 Sept
Staywritten 5 h ago

Stop

Stop keeps the current values and writes nothing new until a person decides.

This shift

Parts this shift
1,840
Scrap rate
3.2%
Cycle time
33.6s

Recent writes

Run 67933.2 s · proposalWritten
Run 67833.2 s · proposalWritten
Run 67733.2 s · proposalWritten
Run 67633.2 s · proposalWritten
Run 67533.2 s · proposalWritten
Run 67433.2 s · proposalWritten