Connected
Lot detail and join · Line A · Batch mixing
Lot 3302 · Grade A-12
Join
estimated
Lot
3302
Charge · Mix · Hold · Discharge · Lab
Batch 2407Lot 3302 to batch 2407
estimatedLink0.93suggested
Driven by time proximity, recipe match, sequence consistency, scanned identifier.
Why this confidence
- Method
- Weights fitted on a verification sample; penalty when several candidates fit
Time0.97Recipe1Sequence0.94Scanned id1Penalty0
Viscosity against spec
EstimatedViscosity2504 mPa·s90% interval 2459 to 2549
Spec 2380 to 2600 mPa·s (dashed). Driven by Linked run outcomes, No lab result yet.
Why this confidence
- Method
- Unanchored, cannot support a decision
- Model fit
- Accepted, four checks passed
Unanchored, cannot support a decisionWaiting for the lab system
Grade A-12, last 14 lots
Runs in this lot
| Run | Ended | Viscosity | Energy per batch | Link |
|---|---|---|---|---|
| Batch 2407 | 16 Oct 00:00 | 2439.6 mPa·s Estimated | 421.7 kWh Measured | 0.93 suggested |
Other Grade A-12 lots
| Lot | Risk | Predicted | Anchor | Join | Status |
|---|---|---|---|---|---|
| 3307 | At risk | 2585 mPa·s | Unanchored | estimated | in process |
| 3292 | On track | 2504 mPa·s | Unanchored | unverified | in process |
| 3294 | On track | 2528 mPa·s | Unanchored | estimated | in process |
| 3298 | On track | 2516 mPa·s | Unanchored | estimated | awaiting lab |
| 3300 | On track | 2480 mPa·s | Unanchored | estimated | awaiting lab |
| 3304 | Watch | 2528 mPa·s | Lab result | estimated | complete |
Facts
- Grade
- Grade A-12
- Spec
- Viscosity 2380 to 2600 mPa·s, target 2490
- Source
- SPEC-A12 rev 4
- Stages
- Charge, Mix, Hold, Discharge, Lab
- Status
- awaiting lab
- Release
- In the plant's quality system only
Evidence on demand
No proof record for this lot. Records exist once a correction or investigation is measured.
Corrections to process
Quality head can send corrections