Connected
Plant
Plant map
Line A · Batches today7Line A · Right first time91.4 %Line A · Energy per batch412 kWh
Line A · on Mixer M1
Line B · on Take-out robot
Needs attention
| Asset | Status | Why | Open decisions |
|---|---|---|---|
| Mixer M1Line A | Normal | Decision waiting | 2 |
| Jacket loopLine A · on Mixer M1 | Normal | Decision waiting | 1 |
| Hold tank H1Line A | Trial | Viscosity drifting up, +38 mPa·s over 9 batches; Hold temperature on trial at 86 °C | |
| Press P3Line B | Normal | Decision waiting | 2 |
| Take-out robotLine B | Normal | ||
| Vision checkLine B · on Take-out robot | Watch | Part weight drifting down, -0.12 g over 3 shift runs |
Running settings on all lines
| Setting | Value | Band | Mode | Written |
|---|---|---|---|---|
| Hold temperatureLine A | 86 °C | 80 to 90 | Trial | 3 h ago |
| Hold timeLine A | 55 min | 40 to 70 | Stay | 6 d ago |
| Agitator speedLine A | 150 rpm | 130 to 170 | Stay | 6 d ago |
| Melt temperatureLine B | 236 °C | 225 to 248 | Stay | 9 d ago |
| Hold pressureLine B | 720 bar | 640 to 820 | Stay | 9 d ago |
| Cycle timeLine B | 33.2 s | 30 to 38 | Stay | 5 h ago |
Discharge pump
Normal
All readings inside their bands.
| Tag | Trend | Last |
|---|---|---|
| Discharge pressureno signed band | 2.33 bar |
Running settings
Hold temperature86 °C · band 80 to 90Trial
Hold time55 min · band 40 to 70Stay
Agitator speed150 rpm · band 130 to 170Stay
Last 3 events
- 13:20Agitator speed proposal on Mixer M1
- 12:30Lot 3307 flagged at risk on viscosity
- 11:00Batch 2417 written at 86 °C (trial arm B)
Since this morning
- 13:20Agitator speed proposal on Mixer M1Line A
- 12:50Hold pressure proposal on Press P3Line B
- 12:30Lot 3307 flagged at risk on viscosityLine A
- 12:00Melt temperature proposal for resin lot R-77Line B
- 11:00Batch 2417 written at 86 °C (trial arm B)Line A
- 09:45Lab results late from the lab system; 4 lots unanchoredLine A