Answers people kept. An answer turns stale when the data it cites changes; the reason and date are shown.

Saved

Line B · 3
Saved answers, Line B
QuestionTopicSaved byConfidenceState
Tool T3 cycle change, valueParts per shift rose 2.6% after the cycle change; the value at the plant's prices is on the owner's Home.ProcessOwner A.19 OctMeasured1.9 to 3.3% parts per shiftStill current
Hold pressure 720 bar, did it hold?Scrap fell 0.6 points and was still holding at the last check.ProcessPlant head A.14 OctMeasured0.3 to 0.9 points less scrapStill current
Light parts on cavity 2Part weight on cavity 2 recovered after Process raised hold pressure.QualityQuality head A.7 OctMeasured48.0 to 48.4 gStill current

Evidence the thread behind each answer cites

Evidence
IdLabelClaimSaved answerProof
EV-B-2101MeasuredParts per shift rose 2.6%, interval 1.9 to 3.3%.Tool T3 cycle change, valueCycle time 33.2 s, Line B
EV-B-2101MeasuredParts per shift rose 2.6%, interval 1.9 to 3.3%.Hold pressure 720 bar, did it hold?Cycle time 33.2 s, Line B
EV-B-2214MeasuredTwo proposals accepted on Line B, one waiting on Line A.Light parts on cavity 2Source record

Light parts on cavity 2

Still current

Part weight on cavity 2 recovered after Process raised hold pressure.

MeasuredBand 48.0 to 48.4 g
Answer as saved, from the thread
Summarise Shift 1 for handover.
MeasuredWeakest of 1 cited claim
Why this confidence
Method
Each claim carries the label of its evidence; the answer takes the weakest. Uncited numbers are removed before an answer is shown.
Evidence
EV-B-2214
  1. Two proposals accepted on Line B, one waiting on Line A.EV-B-2214Measured
Open in AskSaved 7 Oct