Connected
Ask
Saved answers
Saved
Line B · 1
| Question | Topic | Saved by | Confidence | State |
|---|---|---|---|---|
| Light parts on cavity 2Part weight on cavity 2 recovered after Process raised hold pressure. | Quality | Quality head A.7 Oct | Measured48.0 to 48.4 g | Still current |
Went stale
Will a shorter hold work on Grade A-12? · since 17 OctModel of the mixer recalibrated to a-2.2 and its fit is no longer accepted; the safety filter has since withheld this change.Lot 3307 outlook · since 19 OctA correction was sent to Process after this was saved, and lab results for the lot are still missing.
By line and topic
Evidence the thread behind each answer cites
| Id | Label | Claim | Saved answer | Proof |
|---|---|---|---|---|
| EV-B-2214 | Measured | Two proposals accepted on Line B, one waiting on Line A. | Light parts on cavity 2 | Source record |
Light parts on cavity 2
Still current
Part weight on cavity 2 recovered after Process raised hold pressure.
MeasuredBand 48.0 to 48.4 g
Answer as saved, from the threadSummarise Shift 1 for handover.
MeasuredWeakest of 1 cited claim
Why this confidence
- Method
- Each claim carries the label of its evidence; the answer takes the weakest. Uncited numbers are removed before an answer is shown.
- Evidence
- EV-B-2214
- Two proposals accepted on Line B, one waiting on Line A.EV-B-2214Measured
Open in AskSaved 7 Oct